Views: 0 Author: Site Editor Publish Time: 2022-11-03 Origin: Site
The comprehensive wastewater treatment system of Zhonghuan Qingyuan Laboratory consists of wastewater collection, automatic acid-base regulation device, automatic dosing device, coagulation flotation device, heavy metal removal device, new micro electrolysis device, electrochemical catalytic oxidation treatment device, ozone catalytic oxidation treatment device, photo catalytic oxidation treatment device, new biological treatment device, adsorption filtration device, new membrane filtration device and composite disinfection treatment device, To form a complete integrated wastewater treatment system. The system adopts different treatment technologies and processes for comprehensive treatment of different organic, inorganic and biological wastewater components and concentrations, which can effectively remove COD, BOD, SS, chroma, viruses, organic solvents and heavy metal ions from the comprehensive wastewater, and discharge them up to standard after treatment.
This comprehensive wastewater treatment system is an advanced, clean and efficient combination of wastewater treatment technologies, which can be widely used in domestic and foreign research institutes, colleges and universities, environmental monitoring, product inspection, food and drug inspection, entry-exit inspection and quarantine, disease control center, geological and mineral testing center, analysis and testing center, water resource monitoring, grain and oil quality inspection, petrochemical industry, animal husbandry, agricultural product testing, medical institutions, central blood stations Wastewater treatment in enterprises and other industries.
♦ Overall dimensions of equipment:
♦ (The size will vary according to the processing capacity and process of the equipment)
♦ Operating power: 3KW
♦ Equipment power supply: 220V 50Hz
♦ Operating pressure: 0.1~0.6MPa
♦ The installation site must be equipped with power supply, tap water, waste water supply and drainage pipes and external vents;
♦ When installing the equipment, pay attention to adjusting the castor screws to keep the equipment horizontal;
♦ Proper tools and instruments shall be used for effective and accurate installation of equipment, and the accuracy of installation position shall be ensured;
♦ The equipment is of split design and requires on-site commissioning and installation by professional technicians;
♦ The equipment shall be debugged timely after installation.
The treatment process will change according to the actual water quality, and the specific process shall be subject to the actual equipment process!
1. Turn on the power and turn on the power switch. The system starts up and displays the welcome interface. Click the standby interface to enter the system.
Parameter setting description:
1. The range of acid and alkali is set according to the situation. The factory default is: the acid value is set to 6, and the alkali value is set to 9. The equipment will automatically add liquid medicine according to the set value to keep the PH value of wastewater between 6-9;
2. The settling time of flocs in water can be set for settling time;
3 The dosing duration of PAC/ZM pump is used to set the dosing amount;
4 Intermittent dosing time is used for the interval between two dosing;
5 Start up backwashing is a cleaning of ultrafiltration membrane before equipment operation to ensure the normal operation of ultrafiltration membrane;
6 The reaction stirring time is the time of ozone disinfection and oxidation reduction;
6. After setting, click the system overview function key to enter the screen, and click the operation icon to start the automatic operation of the device.
7. If manual operation is required, click Manual Control, and click to activate manual mode. After the manual mode lights up, it can be operated manually. When the system has faults or needs debugging, manual operation can be used under the guidance of professionals. (Do not use manual operation during normal operation. When dredging is required, please open the ball valve at the bottom of the corresponding water tank and switch to the manual state. Click the manual button of the sludge pump, and the system will start dredging.).